Vehicle bridges

Heavy-duty temporary vehicle bridges for safe, stable crossings

Industrial Equipment

Looking for fast, secure vehicle bridges for use across a range of industries?

Our temporary vehicle bridges are designed to handle the heaviest loads and endure the trickiest conditions. From large construction sites to infrastructure projects and event access, we’ve provided solutions for every occasion.


We’ve offered fast, reactive service for watercourses, weak structures and excavation zones. Our bridges can support a weight of up to 44 tonnes, so whether you’re moving large vehicles such as HGVs, or plant equipment, we’re here to support.


We’ll handle the early planning process, through to set up and removal, allowing you to stay safe, compliant and productive. Let us help keep your project moving. 

Keeping site traffic moving

Vehicle bridges are used where site traffic needs to cross gaps, water or weak ground safely, without overstressing existing routes or structures.
  • Construction & infrastructure

    Construction & infrastructure

    Provide temporary vehicle access across excavations, watercourses or restricted ground while major works are carried out.

  • Highways & utilities works

    Highways & utilities works

    Maintain site access for construction traffic during road, rail and utility works where permanent routes are unavailable or unsuitable.

  • Restricted or weakened bridges

    Restricted or weakened bridges

    Create an alternative crossing where existing bridges have load restrictions, allowing vehicles to continue moving safely.

  • Temporary access over water & voids

    Temporary access over water & voids

    Span ditches, moats and other impassable features to keep site traffic flowing without long diversions.

44t
Maximum vehicle load
Up to 24m
Available bridge spans

How We Deliver Your Bridge Solution

1
Site Review

We assess span, loading, ground conditions and access constraints to confirm the right solution.

2
Planning & Approvals

We support calculations and approvals, including temporary planning and Approval in Principle where required.

3
Design & Preparation

The bridge layout is confirmed to suit site conditions, load requirements and safety needs.

4
Delivery & Installation

Bridges are delivered and installed by experienced teams to suit your programme.

5
Handover & Removal

Handover checks are completed, with support for adjustments or removal when no longer needed.

We offer a range of on-site solutions

  • Creating access for a major housing development

    Creating access for a major housing development

    We installed a temporary vehicle bridge over a brook, enabling construction traffic to reach the site and helping work stay on schedule.

    Download case study
  • Supporting vital upgrades to the power network

    Supporting vital upgrades to the power network

    Our temporary vehicle bridges provided safe, reliable access for heavy machinery carrying out overhead line refurbishment in remote locations.

    Download case study
  • Keeping a quarry operational after flooding

    Keeping a quarry operational after flooding

    When flooding cut off access across the site, we installed a temporary vehicle bridge in just one day to help keep operations moving

    Download case study

Vehicle bridges FAQs